FAQs

    How long will the revitalization project take?

    The Main Street Unionville restoration project is anticipated to begin in August 2024 and be completed by December 2025.

    Will the project impact Main Street Unionville business hours?

    No impact on business hours is expected. Although the project will involve significant construction activities, the contractor is required to maintain access to all residences and businesses at all times. Efforts will be made to minimize disruptions to business operations.

    What alternative routes or detours will be provided for traffic?

    Alternative routes and detours will be clearly marked and managed according to approved traffic control plans, which will be communicated in advance. The project includes provisions for temporary access roads and detailed traffic control measures to ensure smooth traffic flow during construction.

    Will Main Street Unionville still be open for pedestrian traffic?

    Yes, pedestrian access to all residences and commercial properties will be maintained at all times. Temporary fencing, ramping, and platforms will be used to ensure safe passage for pedestrians around the construction zones.

    Will Main Street Unionville sidewalks still be accessible for residents and visitors with mobility issues?

    Yes, the contractor is required to maintain accessible sidewalks and pedestrian paths. Measures such as ramping and platforms with railings will be implemented to facilitate access across work zones.

    Where can I park during construction?

    Specific parking arrangements during construction will be communicated in advance. Temporary access roads and designated parking areas will be provided to accommodate both residents and visitors.

    Will there be changes to bus stops or schedules?

    Any changes to bus stops or schedules due to construction will be coordinated with local transit authorities and communicated to the public in advance. Efforts will be made to minimize disruptions to public transit services.

    What are the specific improvements being made?

    The project includes several key improvements:

    • Reduced roadway width with widened boulevards for parking and pedestrian use
    • Pavement structure enhancements with interlock brick pavers
    • Increased tree canopy and upgraded street lighting.
    • Street amenity alcoves with seating, bicycle rings, and garbage facilities
    • Replacement and lining of watermains, storm sewer repairs, and pedestrian protection measures.
    • Installation of new pedestrian crossovers and utility ducts for future upgrades